Skip to content

Blog

Notes from the build

How structural work actually runs in Palm Beach County: what we keep in house, how we build to a designer’s drawings, and what to settle before anyone breaks ground.

Poured concrete columns rising from the foundation

Structural work2 min read

Why we lead with the structure

Additions, shell work and concrete are the scope most contractors hand off. Keeping it in house is why TÈR exists, and it changes your schedule and budget.

  • A graded building pad staked out on a waterfront lot lined with palms

    Planning1 min read

    What to settle before you break ground

    Four questions decide how a Palm Beach County build actually goes, and every one of them is answerable before a single permit is filed.

  • The finished two-storey Mediterranean home with a barrel tile roof and a landscaped entry

    Working with designers2 min read

    Building to your designer’s drawings

    Homeowners hire the designer. The designer draws the plans. TÈR executes them, to the line. Here is how that division of labor works on a live site.

Ready when your plans are.

Send us the drawings, or start the conversation before you have them. Either way, the first step is a walkthrough and a real budget.

Call NowStart Your Project